How to finish the report on-site (not at midnight)
6 min read
Dictate findings into the comment placeholders, attach photos inside the finding, mark up before you leave the room. The exact InspectDeck flow that cuts 90 minutes per report…
Read →Workflows, report writing, and product updates. Three starters included — replace with your own posts.
6 min read
Dictate findings into the comment placeholders, attach photos inside the finding, mark up before you leave the room. The exact InspectDeck flow that cuts 90 minutes per report…
Read →4 min read
Panel labels, water heater data plates, roof geometry, opening protection — which angles prevent callbacks, and how to file them in .inspecx…
Read →3 min read
At 8 inspections/mo, per-report tools cost more than InspectDeck’s single $59 plan — and punish your best months. Full breakdown…
Read →Full post template — replace this copy. Recommended structure: problem → 5-step InspectDeck workflow (template → findings → photos-in-finding → markup → export summary on driveway) → checklist download CTA → trial button.
Template — add 6 annotated example shots (panel, WH plate, attic, roof, openings, HVAC dataplate) + reminder to attach the OIR-B1-1802 version in effect.
Template — table at 4 / 8 / 12 inspections/mo comparing $X/report tools vs $59 unlimited. Ends with trial CTA.